For the architect

Water supply & drainage drawings (MEP - water)

7 notes

Step 1

Before signing the contract

0 notes

Get to know each other and make both sides' expectations clear before signing with the architect.

Step 2

Guiding principles

0 notes

Apply to every item; restate them to the architect and contractor from the start.

Step 3

Design & preparation

0 notes

Things to settle before construction starts.

Step 4

Structure & rough construction

0 notes

Foundation, floors, walls, concrete, waterproofing.

Step 5

In-wall building systems

7 notes

Electrical, plumbing, air-conditioning, network — done before plastering and tiling.

Detailed water supply and drainage MEP drawings

Detailed water supply and drainage MEP drawings

Detailed water supply and drainage MEP drawings so the architect and contractor work to the same standard - workers build to the drawings, not to habit. Do not cut costs on the water system.

Separate drainage

Separate drainage

Separate drainage: a clog in one line does not paralyse or back up into another area.

Step 6

Surface finishing

0 notes

Floors, walls, ceilings, doors, paint.

Step 7

Equipment & built-in cabinetry

0 notes

Kitchen, sanitary ware, built-in cabinets.

Step 8

Furniture, lighting & decor

0 notes

Loose furniture and lighting, done last inside the house.

Step 9

Garden & exterior

0 notes

Gate, yard, plants, irrigation.

Step 10

Handover, operation & maintenance

0 notes

Checks before taking over the house and after moving in.