For the architect

Stairs and railings

6 notes

Step 1

Before signing the contract

0 notes

Get to know each other and make both sides' expectations clear before signing with the architect.

Step 2

Guiding principles

0 notes

Apply to every item; restate them to the architect and contractor from the start.

Step 3

Design & preparation

0 notes

Things to settle before construction starts.

Step 4

Structure & rough construction

6 notes

Foundation, floors, walls, concrete, waterproofing.

Absolutely safe stairs

Absolutely safe stairs

A house with small children -> the stairs must be absolutely safe: no feet slipping through, no falling through gaps, no climbing (no horizontal bars).

Step 5

In-wall building systems

0 notes

Electrical, plumbing, air-conditioning, network — done before plastering and tiling.

Step 6

Surface finishing

0 notes

Floors, walls, ceilings, doors, paint.

Step 7

Equipment & built-in cabinetry

0 notes

Kitchen, sanitary ware, built-in cabinets.

Step 8

Furniture, lighting & decor

0 notes

Loose furniture and lighting, done last inside the house.

Step 9

Garden & exterior

0 notes

Gate, yard, plants, irrigation.

Step 10

Handover, operation & maintenance

0 notes

Checks before taking over the house and after moving in.