For the architect

Electrical drawings (MEP - electrical)

3 notes

Step 1

Before signing the contract

0 notes

Get to know each other and make both sides' expectations clear before signing with the architect.

Step 2

Guiding principles

0 notes

Apply to every item; restate them to the architect and contractor from the start.

Step 3

Design & preparation

0 notes

Things to settle before construction starts.

Step 4

Structure & rough construction

0 notes

Foundation, floors, walls, concrete, waterproofing.

Step 5

In-wall building systems

3 notes

Electrical, plumbing, air-conditioning, network — done before plastering and tiling.

Detailed electrical drawings

Detailed electrical drawings

Detailed electrical drawings so the architect and contractor work to the same standard - workers build to the drawings, not to habit. Do not cut costs on the electrical system.

No shared power supply

No shared power supply

Do not share one supply among many electrical devices: each high-power device gets its own wiring run - e.g. the washer and dryer run separately; induction cooktop, oven, microwave, rice cooker, dishwasher... one run and one dedicated socket per machine (the kitchen area uses the most electricity). Wires rated for the load, sensibly calculated, a little spare capacity; no shared wires.

Step 6

Surface finishing

0 notes

Floors, walls, ceilings, doors, paint.

Step 7

Equipment & built-in cabinetry

0 notes

Kitchen, sanitary ware, built-in cabinets.

Step 8

Furniture, lighting & decor

0 notes

Loose furniture and lighting, done last inside the house.

Step 9

Garden & exterior

0 notes

Gate, yard, plants, irrigation.

Step 10

Handover, operation & maintenance

0 notes

Checks before taking over the house and after moving in.