Quiet house
Quiet house - the family is very sensitive to noise. Noise needs to be blocked from: air conditioners, traffic, activities inside the house, neighbours' houses.
For the architect
2 notes
Get to know each other and make both sides' expectations clear before signing with the architect.
Apply to every item; restate them to the architect and contractor from the start.

Quiet house - the family is very sensitive to noise. Noise needs to be blocked from: air conditioners, traffic, activities inside the house, neighbours' houses.

No noise from night rain: no "ton ton" sound of rain tapping on a corrugated metal roof or iron bars.
Things to settle before construction starts.
Foundation, floors, walls, concrete, waterproofing.
Electrical, plumbing, air-conditioning, network — done before plastering and tiling.
Floors, walls, ceilings, doors, paint.
Kitchen, sanitary ware, built-in cabinets.
Loose furniture and lighting, done last inside the house.
Gate, yard, plants, irrigation.
Checks before taking over the house and after moving in.