For the architect

Bedroom design

6 notes

Step 1

Before signing the contract

0 notes

Get to know each other and make both sides' expectations clear before signing with the architect.

Step 2

Guiding principles

0 notes

Apply to every item; restate them to the architect and contractor from the start.

Step 3

Design & preparation

0 notes

Things to settle before construction starts.

Step 4

Structure & rough construction

0 notes

Foundation, floors, walls, concrete, waterproofing.

Step 5

In-wall building systems

0 notes

Electrical, plumbing, air-conditioning, network — done before plastering and tiling.

Step 6

Surface finishing

0 notes

Floors, walls, ceilings, doors, paint.

Step 7

Equipment & built-in cabinetry

0 notes

Kitchen, sanitary ware, built-in cabinets.

Step 8

Furniture, lighting & decor

6 notes

Loose furniture and lighting, done last inside the house.

Bedroom only for relaxing

Bedroom only for relaxing

The bedroom is only for relaxing, sleeping, and a bit of play for the child in the evening - gentle, Mediterranean or wabi sabi style.

Bedroom lighting

Bedroom lighting

Bedroom lighting: layered, glare-free, no ceiling light, two-way switches on both sides of the bed head - turn off the light without leaving the bed.

Secondary bedroom

Secondary bedroom

A secondary bedroom may need no design, or limit built-ins so it can be re-designed later - it should not be designed specifically for one age. The ground-floor room: when built it could be a study but later a bedroom - so electrical equipment (lights, sockets) and water must be planned for in advance; later only loose furniture needs to be bought as replacement.

Step 9

Garden & exterior

0 notes

Gate, yard, plants, irrigation.

Step 10

Handover, operation & maintenance

0 notes

Checks before taking over the house and after moving in.