Cost estimates for planning

50 notes

Step 1

Before signing the contract

0 notes

Get to know each other and make both sides' expectations clear before signing with the architect.

Step 2

Guiding principles

5 notes

Apply to every item; restate them to the architect and contractor from the start.

Step 3

Design & preparation

6 notes

Things to settle before construction starts.

Step 4

Structure & rough construction

3 notes

Foundation, floors, walls, concrete, waterproofing.

Step 5

In-wall building systems

0 notes

Electrical, plumbing, air-conditioning, network — done before plastering and tiling.

Step 6

Surface finishing

13 notes

Floors, walls, ceilings, doors, paint.

Upgrades over the package

Upgrades over the package

Upgrades over the package (only the difference is charged): main door, bedroom doors, WC doors, toilets, lavabo, in-wall shower, towel dryer, kitchen sink + tap, lights - 9 items (see the Suggestions in the "For the architect" section).

Plasterboard ceiling

Plasterboard ceiling

Plasterboard ceiling: flat ceiling, no stepped levels - a deduction for the stepped part can be requested.

Interior and exterior paint

Interior and exterior paint

Water-based paint inside and outside the house (skim coat, primer, topcoat). Textured / rough paint may be charged extra.

Floor, WC and yard tiles

Floor, WC and yard tiles

Floor tiles, WC tiles, yard and balcony tiles, skirting. If materials are self-selected, the difference is refunded or topped up according to the invoice.

Arched doors, main door, eTimber gate

Arched doors, main door, eTimber gate

Curved arch doors, the main door and the eTimber gate: charged separately, see the Suggestions in the "For the architect" section (doors are charged only for the difference).

Basic sanitary ware

Basic sanitary ware

Basic sanitary ware: toilet, lavabo, tap, shower, floor drain, stainless steel water tank. Self-selected items are charged only for the difference (see the Suggestions in the "For the architect" section).

AC copper pipe and network cable

AC copper pipe and network cable

AC copper pipe and network / camera cable: the standard package includes only a little (20-30 m of copper pipe, 1-4 camera positions); additional quantities are charged separately.

Step 7

Equipment & built-in cabinetry

2 notes

Kitchen, sanitary ware, built-in cabinets.

Furniture - 15 items

Furniture - 15 items

Furniture: sofa (Hè Studio or Casanha ISLAND), Hè Studio (2 beds, 6 dining chairs, armchair, stool), 2 mattresses, kitchen cabinets + island + stone, wardrobe + shoe cabinet, Blum, curtains, rug, paintings, tables, massage chair - 15 items (see the Suggestions in the "For the architect" section).

Electrical equipment - 20 items

Electrical equipment - 20 items

Electrical equipment: 3 air conditioners, kitchen appliances, washer + dryer, TV, robot, hot water, whole-house filter, ceiling fans, cameras, locks, car charger - 20 items (see the "Owner's picks" section; hot water and ceiling fans: see the Suggestions in the "For the architect" section).

Step 8

Furniture, lighting & decor

0 notes

Loose furniture and lighting, done last inside the house.

Step 9

Garden & exterior

7 notes

Gate, yard, plants, irrigation.

eTimber gate + motor, BBQ area

eTimber gate + motor, BBQ area

eTimber gate + motor, BBQ area (charcoal grill, outdoor table and chairs) - 4 items (gate, motor, table and chairs: see the Suggestions in the "For the architect" section; grill: see the "Owner's picks" section).

Yard paving, walkways, parking

Yard paving, walkways, parking

Paving of the yard, walkways and parking space (~90 m²): outdoor stone / tiles, a vehicle-load-bearing base, yard drainage.

Perimeter fence wall

Perimeter fence wall

Surrounding perimeter wall - provisionally ~35 m long x 2 m high (re-measure against the land-use certificate (sổ)).

Garden lights

Garden lights

Garden lights: 2 large yard lights, path lights, outdoor wiring.

Step 10

Handover, operation & maintenance

5 notes

Checks before taking over the house and after moving in.

House registration fee

House registration fee

House registration fee: 0.5% x ~280 m² floor area (ground floor + first floor + rooftop room) x the new-house unit price of the Ho Chi Minh City People's Committee (UBND).

Certificate issuance fee

Certificate issuance fee

Fee for issuing the certificate (registration of the house as an asset); filing online may differ.

Contingency of ~10%

Contingency of ~10%

Contingency of ~10% of the items that already have a price - increase it when quotes arrive for the remaining items.

Not tied to a step

9 notes

Rough construction

Rough construction

Foundation, frame, floors, walls, roof, waterproofing, in-wall plumbing and electrical - Butecco, ~400 m².

Finishing work

Finishing work

Contractor package, 340 m²: plasterboard, paint, tiles, doors, stairs, switches + basic lights, basic sanitary ware. Plus upgrades: main door, 3 arched bedroom doors, 4 WC doors, toilet, lavabo, in-wall shower, kitchen sink + tap, lights.

Furniture items

Furniture items

Sofa (Hè Studio or Casanha ISLAND), Hè Studio (2 beds, 6 dining chairs, armchair, stool), 2 Ru9 mattresses, kitchen cabinets + island + stone, wardrobe + shoe cabinet, Blum, curtains, rug (consider Casanha), paintings, dining table, sofa table, work desk, massage chair.

Electrical equipment

Electrical equipment

3 air conditioners, fridge, dishwasher, induction hob, range hood, kitchen appliances, washer + dryer, TV + box, robot, hot water, whole-house filter, 2 ceiling fans, cameras + wifi, locks, car charger.

Garden & yard

Garden & yard

Yard ~197 m²: eTimber gate + motor, paving of the yard + walkways + parking, lawn + soil + plants + automatic irrigation, perimeter wall, yard lights, BBQ-area pergola, grill + BBQ table and chairs.