Budget

Garden & landscape

7 notes

Step 1

Before signing the contract

0 notes

Get to know each other and make both sides' expectations clear before signing with the architect.

Step 2

Guiding principles

0 notes

Apply to every item; restate them to the architect and contractor from the start.

Step 3

Design & preparation

0 notes

Things to settle before construction starts.

Step 4

Structure & rough construction

0 notes

Foundation, floors, walls, concrete, waterproofing.

Step 5

In-wall building systems

0 notes

Electrical, plumbing, air-conditioning, network — done before plastering and tiling.

Step 6

Surface finishing

0 notes

Floors, walls, ceilings, doors, paint.

Step 7

Equipment & built-in cabinetry

0 notes

Kitchen, sanitary ware, built-in cabinets.

Step 8

Furniture, lighting & decor

0 notes

Loose furniture and lighting, done last inside the house.

Step 9

Garden & exterior

7 notes

Gate, yard, plants, irrigation.

eTimber gate + motor, BBQ area

eTimber gate + motor, BBQ area

eTimber gate + motor, BBQ area (charcoal grill, outdoor table and chairs) - 4 items (gate, motor, table and chairs: see the Suggestions in the "For the architect" section; grill: see the "Owner's picks" section).

Yard paving, walkways, parking

Yard paving, walkways, parking

Paving of the yard, walkways and parking space (~90 m²): outdoor stone / tiles, a vehicle-load-bearing base, yard drainage.

Perimeter fence wall

Perimeter fence wall

Surrounding perimeter wall - provisionally ~35 m long x 2 m high (re-measure against the land-use certificate (sổ)).

Garden lights

Garden lights

Garden lights: 2 large yard lights, path lights, outdoor wiring.

Step 10

Handover, operation & maintenance

0 notes

Checks before taking over the house and after moving in.