Rough construction (Butecco)
Rough construction (Butecco) x ~400 m² billable area.
Budget
3 notes
Get to know each other and make both sides' expectations clear before signing with the architect.
Apply to every item; restate them to the architect and contractor from the start.
Things to settle before construction starts.
Foundation, floors, walls, concrete, waterproofing.

Rough construction (Butecco) x ~400 m² billable area.

Pile driving / foundation reinforcement.

Electricity and water connections (applying for electricity and water meters).
Electrical, plumbing, air-conditioning, network — done before plastering and tiling.
Floors, walls, ceilings, doors, paint.
Kitchen, sanitary ware, built-in cabinets.
Loose furniture and lighting, done last inside the house.
Gate, yard, plants, irrigation.
Checks before taking over the house and after moving in.