Rough construction
Foundation, frame, floors, walls, roof, waterproofing, in-wall plumbing and electrical - Butecco, ~400 m².
Budget
9 notes
Get to know each other and make both sides' expectations clear before signing with the architect.
Apply to every item; restate them to the architect and contractor from the start.
Things to settle before construction starts.
Foundation, floors, walls, concrete, waterproofing.
Electrical, plumbing, air-conditioning, network — done before plastering and tiling.
Floors, walls, ceilings, doors, paint.
Kitchen, sanitary ware, built-in cabinets.
Loose furniture and lighting, done last inside the house.
Gate, yard, plants, irrigation.
Checks before taking over the house and after moving in.

Foundation, frame, floors, walls, roof, waterproofing, in-wall plumbing and electrical - Butecco, ~400 m².

Contractor package, 340 m²: plasterboard, paint, tiles, doors, stairs, switches + basic lights, basic sanitary ware. Plus upgrades: main door, 3 arched bedroom doors, 4 WC doors, toilet, lavabo, in-wall shower, kitchen sink + tap, lights.

Sofa (Hè Studio or Casanha ISLAND), Hè Studio (2 beds, 6 dining chairs, armchair, stool), 2 Ru9 mattresses, kitchen cabinets + island + stone, wardrobe + shoe cabinet, Blum, curtains, rug (consider Casanha), paintings, dining table, sofa table, work desk, massage chair.

3 air conditioners, fridge, dishwasher, induction hob, range hood, kitchen appliances, washer + dryer, TV + box, robot, hot water, whole-house filter, 2 ceiling fans, cameras + wifi, locks, car charger.

Yard ~197 m²: eTimber gate + motor, paving of the yard + walkways + parking, lawn + soil + plants + automatic irrigation, perimeter wall, yard lights, BBQ-area pergola, grill + BBQ table and chairs.

Design.

Site clearance, building permit, registration fee, issuing the certificate.

Bedding, tableware, household items, moving.

~10% of the items that already have a price.