
House registration fee
House registration fee: 0.5% x ~280 m² floor area (ground floor + first floor + rooftop room) x the new-house unit price of the Ho Chi Minh City People's Committee (UBND).
Budget
3 notes
Get to know each other and make both sides' expectations clear before signing with the architect.
Apply to every item; restate them to the architect and contractor from the start.
Things to settle before construction starts.
Foundation, floors, walls, concrete, waterproofing.
Electrical, plumbing, air-conditioning, network — done before plastering and tiling.
Floors, walls, ceilings, doors, paint.
Kitchen, sanitary ware, built-in cabinets.
Loose furniture and lighting, done last inside the house.
Gate, yard, plants, irrigation.
Checks before taking over the house and after moving in.

House registration fee: 0.5% x ~280 m² floor area (ground floor + first floor + rooftop room) x the new-house unit price of the Ho Chi Minh City People's Committee (UBND).

Fee for issuing the certificate (registration of the house as an asset); filing online may differ.

Completion certification drawings / current-state survey drawings (hired service).