The home-building journey of Văn, Như & Louis 🏡

This is the journey of Văn, Như and our baby Louis as we build our family's first home — a warm and cozy nest, a place we long to come back to every day.

We love the rustic charm of natural materials, the greenery tucked into every little corner and the early sunlight streaming through the windows. A simple, welcoming home that carries our family's own touch.

This site keeps a record of our journey, from the first days of preparation, with MM++ Architects and the Butecco construction team alongside us, to the day the whole family officially moves into our new home.

The notes and questions are arranged in 3 ways: by topic, by construction sequence and by area. Pick whichever suits you; all three hold the same notes.

Area

241 notes

Building systems

56 notes
Wastewater drains well

Wastewater drains well

Wastewater drains well even though the area has no public sewer yet; connecting later when a sewer arrives is easy.

Septic tank and water tank

Septic tank and water tank

Septic tank, water tank and the parts that are hard to change later are sized for the number of future users: currently 3-4 people, later 5-8 people (3 generations).

Future swimming pool

Future swimming pool

Future swimming pool (maybe 10-20 years from now): plan the space so there is room to build it then; leave the water line ready.

Bathroom waterproofing height
Question

Bathroom waterproofing height

Should bathroom waterproofing go up to 1.8-2 m, or is the whole wall better? Is reverse waterproofing on the ceiling of the floor below needed? Should waterproofing be tested by flooding for 72 hours?

Power socket locations

Power socket locations

Brainstorm all the positions that need power sockets; slightly more sockets - 2, 3 or 4 depending on the area; use universal sockets (fit every kind of plug). Heavily used areas (living room, kitchen, shared area...): better too many than too few - always have a socket ready when needed or when adding equipment.

Electrical design with spare capacity

Electrical design with spare capacity

Electrical designed around the family's usage habits and with spare reserve capacity for the future (kitchen and toilet appliances...) - buying more equipment does not mean re-running wires; heavily used areas (living room, kitchen, shared area...) get even more spare capacity.

Adding a floor later

Adding a floor later

Adding a floor later without breaking walls or running exposed wires: prepare electrical and water lines in advance for connecting.

Easy, safe electrical maintenance

Easy, safe electrical maintenance

Easy and safe electrical maintenance: a separate circuit breaker (CB / aptomat) for each room on the electrical panel; choose the right type of CB for each circuit.

Master switch for the whole house
Question

Master switch for the whole house

Have 1 master switch for the whole house (e.g. when away): press it to cut all power, except the fridge, cameras and wifi / network. Besides the fridge, cameras and wifi - what other equipment should keep power when the master switch is off?

Separate wiring per light and device

Separate wiring per light and device

Each light bulb, fan and device on its own wiring: its own live wire + neutral wire, not sharing one neutral wire, not borrowing wires - when one line fails, only that line is repaired, easy to fix.

DC-motor ceiling fans

DC-motor ceiling fans

DC-motor ceiling fans, 2 of them: living room + kitchen - the architect advises on the style.

Electrical safety

Electrical safety

Electrical safety: the whole system is earthed (grounded); an earth wire accompanies every socket and device, including outdoors - devices do not leak current, no shocks.

Smart home is especially important

Smart home is especially important

Smart home - especially important: alarm sensors, phone notifications... ensure security for the house, especially when away. Ready for automatic curtains and lights switched on/off through an app.

Recessed sockets
Question

Recessed sockets

Should electrical devices and sockets be recessed into the wall?

Detailed water supply and drainage MEP drawings

Detailed water supply and drainage MEP drawings

Detailed water supply and drainage MEP drawings so the architect and contractor work to the same standard - workers build to the drawings, not to habit. Do not cut costs on the water system.

Separate drainage

Separate drainage

Separate drainage: a clog in one line does not paralyse or back up into another area.

Detailed electrical drawings

Detailed electrical drawings

Detailed electrical drawings so the architect and contractor work to the same standard - workers build to the drawings, not to habit. Do not cut costs on the electrical system.

No shared power supply

No shared power supply

Do not share one supply among many electrical devices: each high-power device gets its own wiring run - e.g. the washer and dryer run separately; induction cooktop, oven, microwave, rice cooker, dishwasher... one run and one dedicated socket per machine (the kitchen area uses the most electricity). Wires rated for the load, sensibly calculated, a little spare capacity; no shared wires.

Build to the MEP drawings

Build to the MEP drawings

Plumbing and electrical work done exactly to the MEP drawings; workers can read drawings; experienced electricians who work carefully. No changing pipe routes by themselves to save money.

PPR heat welding done correctly

PPR heat welding done correctly

PPR pipes heat-welded to proper technique: not pushed too hard so the pipe end collapses, not too lightly so the joint leaks.

Water supply test before covering

Water supply test before covering

Test the water supply before building the pipe shaft / closing the ceiling: pressurise, place pressure gauges at the outlets; no leaks, no joints popping.

Drainage test before covering

Drainage test before covering

Test drainage before covering: plug the outlets, pump in water and soak for a while, no leakage. Also check: slope, pipe diameter, vent pipes, correct connections (toilet, floor drain, rain water kept separate).

Minimise wire joints

Minimise wire joints

Minimise wire joints; where a joint is unavoidable, make it firm and insulate it well. Long runs have junction boxes (about every 10 m) to make pulling and replacing wires easy.

Do not pull wires too tight

Do not pull wires too tight

Do not pull wires too tight around corners (stretches the copper core, damages the sheath); do not stuff too many wires into a conduit - leave breathing room so wires can be pulled out and replaced later.

Separate wiring per light

Separate wiring per light

Each light bulb and device gets its own live wire + neutral wire, no borrowed wires; a full earth (ground) wire is run as well.

85-inch Samsung TV

85-inch Samsung TV

85" TV: Samsung QA85QN70F (Neo QLED, ~28.89M VND) or Samsung UA85U8500F (~19.34M VND).

Robot vacuum cleaner

Robot vacuum cleaner

Robot vacuum: Ecovacs T90 Omni Pro or Roborock Saros 20 (a different model may be out by the time of building). Remember to measure the robot's height + size to plan electricity, water and the clearance height of furniture: sofa, chairs, beds...

Drinking water purifier

Drinking water purifier

Drinking water purifier (optional - the whole-house filter is already there): AO Smith S400 or Maxdream; need to work with a water filtration company.

Home EV charger

Home EV charger

EV charger at home (BYD / Geely may include it free - check when buying the car).