Concrete curing for 28 days
Cure concrete for a full 28 days; protect walls for a few days after building; wet the walls before plastering.
For the contractor
4 notes
Get to know each other and make both sides' expectations clear before signing with the architect.
Apply to every item; restate them to the architect and contractor from the start.
Things to settle before construction starts.
Foundation, floors, walls, concrete, waterproofing.

Cure concrete for a full 28 days; protect walls for a few days after building; wet the walls before plastering.

Walls do not crack where 2 materials meet (e.g. concrete - brick).

Door edges plastered straight.

Floors and walls as flat and straight as possible.
Electrical, plumbing, air-conditioning, network — done before plastering and tiling.
Floors, walls, ceilings, doors, paint.
Kitchen, sanitary ware, built-in cabinets.
Loose furniture and lighting, done last inside the house.
Gate, yard, plants, irrigation.
Checks before taking over the house and after moving in.