
Concrete curing for 28 days
Cure concrete for a full 28 days; protect walls for a few days after building; wet the walls before plastering.
For the contractor
4 notes


Cure concrete for a full 28 days; protect walls for a few days after building; wet the walls before plastering.

Walls do not crack where 2 materials meet (e.g. concrete - brick).

Door edges plastered straight.

Floors and walls as flat and straight as possible.