Inspect before the next step
Finish checking before moving on to the next step: check electrical, cables, network (for water: see the water supply and drainage tests in the "In-wall plumbing & electrical" section).
For the contractor
3 notes
Get to know each other and make both sides' expectations clear before signing with the architect.
Apply to every item; restate them to the architect and contractor from the start.
Things to settle before construction starts.
Foundation, floors, walls, concrete, waterproofing.
Electrical, plumbing, air-conditioning, network — done before plastering and tiling.
Floors, walls, ceilings, doors, paint.
Kitchen, sanitary ware, built-in cabinets.
Loose furniture and lighting, done last inside the house.
Gate, yard, plants, irrigation.
Checks before taking over the house and after moving in.

Finish checking before moving on to the next step: check electrical, cables, network (for water: see the water supply and drainage tests in the "In-wall plumbing & electrical" section).

Drainage test: no standing water on the floor.

Protection against insects, cockroaches and rats.